Architecture
Concept, masterplanning, facade & sustainable envelopes for residential, commercial and civic programs.
SKZ Architects & Engineers is a design-and-build practice working between the drawing board and the construction site — from first sketch to final rebar, every project carries one authored line of thought.

We are an architecture and engineering practice rooted in Debra, West Medinipur. Our work moves fluidly between concept sketches, parametric BIM models and the realities of the pour: a single team authoring the drawing, the detail and the decision on site. The result is architecture that is quietly inevitable.
Every project is handled by senior principals — no file leaves the studio without structural logic, buildability and craft reconciled.
Concept, masterplanning, facade & sustainable envelopes for residential, commercial and civic programs.
Foundation design, seismic resistance, concrete & steel frame calculation and site safety certification.
Bespoke spatial layouts, ergonomic detailing, lighting schemes and curated material palettes.
Photoreal rendering, daylight simulation and walkthrough animation prior to breaking ground.
Feasibility studies, BOQ, construction scheduling and regulatory clearance management.
LOD 200–400 architectural information modeling, parametric detailing and clash coordination.
3D rebar detailing, steel fabrication models and digital twins ready for contractor hand-off.
Reach us directly — or share project details and we'll come back within one working day.